Engineering Services
BOQ, BBS & Quantity Estimation
Independent civil estimation and quantity surveying consulting powered by our in-house Infrava engineering software.
Execution Scope & Technical Deliverables
Detailed quantity take-off from 2D CAD architectural and structural drawings
Bar Bending Schedules (BBS) calculated per IS 2502 with full audit formulas
Rate analysis based on current DSR (District Schedule of Rates) and market prices
Reconciliation reports comparing tender bill quantities with drawing reality
Technical Parameters
DeliverablesAudit-stamped Excel BBS, BOQ Summary, RFI List
Turnaround Time48 to 72 hours for standard building framing
Review WorkflowDouble-tier Maker-Checker civil engineer verification
Applicable Engineering Standards
IS 1200 (All Parts) Method of Measurement
CPWD / PWD DSR Standards
All materials are sampled, slump-tested, and third-party laboratory tested per Bureau of Indian Standards mandates.
