Audit-Transparent Economics

Infrava ROI & Savings Estimator

Calculate exact hours and project expenditure saved by automating manual rebar take-offs and BOQ scheduling.

25 drawings
2 (Boutique firm)50 (Mid-size contractor)150+ (EPC infrastructure)
6.5 hours
2 hrs (Simple Footings)6.5 hrs (Typical Beam Schedule)16 hrs (Complex Podium/Bridge)
₹450 / hr
₹200/hr (Junior CAD)₹450/hr (Average QS Engineer)₹1,500/hr (Senior Principal)
Estimated Net Annual Savings
₹7,45,875
Equivalent to ₹62,156 in monthly engineering overhead savings.
Annual Hours Saved
1,656 hrs
Net Efficiency
85%
Transparent Formula Definition

Annual Savings = (25 drawings/mo) × (6.5 hrs/drawing) × (₹450/hr) × 12 months × 0.85 net efficiency = ₹7,45,875

*The 0.85 factor accounts for 15% engineer review & verification time. No hidden assumptions.

Detailed Assumptions Behind the Economic Model

Standard manual BBS preparation for a complex multi-span RCC beam schedule or column schedule requires approximately 6 to 8 hours for a qualified Quantity Surveyor (measuring bar cut lengths, calculating bends, applying laps, and typing into spreadsheets).

Infrava performs the vector extraction and deterministic IS 2502 cutting calculation in under 60 seconds. We apply a net efficiency factor of 85% (0.85 multiplier) to allow 15% of engineer review time under the Maker-Checker workflow.