Engineering Transparency
Infrava Technical Roadmap
We maintain total transparency regarding what is built, what is in active development, and what is planned. No inflated claims.
Q3-Q4 2026 · Completed
Production Verified
Phase 1: Deterministic Math Core & BIS Standards Engine
- Pure deterministic calculation engine in TypeScript for IS 2502:1963 and IS 1786:2008.
- Accurate bend deductions (1d for 45°, 2d for 90°, 3d for 135°, 4d for 180°).
- Seismic stirrup hook allowance (9d or 75mm minimum per IS 13920:2016).
- Audit-stamped ExcelJS workbook generator with live formulas and verification hashes.
- 100% automated Vitest unit test coverage for civil formulas.
Q4 2026 (Active) · Active Development
In Active Engineering
Phase 2: DXF Vector Entity Extraction & RFI Detection
- Browser-native and server-side ASCII DXF parser for LINES, LWPOLYLINES, TEXT, and CIRCLES.
- Automated bounding box calculation and layer clustering for columns and beams.
- Strict "No Guessing" rule: unclassified shapes are flagged as explicit RFI questions.
- Maker-Checker-Approver three-tier approval workflow scaffold.
- Private beta onboarding for selected structural design and QS firms.
Q1 2027 · Scheduled
Phase 3: DWG Vector Parser & Automated Schedule OCR
- Direct DWG format vector parsing via high-performance Cloud Run workers.
- Automated column schedule table cross-referencing (linking C1 tags on plan to schedule rebar lists).
- Concrete mix proportioning and dry-volume calculation per IS 456 Clause 9.
- Multi-tenant workspace permissions for contractor and consultant collaboration.
Q2 2027 · Scheduled
Phase 4: Bar Cutting Optimization (1D Stock Cutting Algorithm)
- 1D linear cutting stock optimization algorithm to minimize standard 12-meter commercial bar offcuts below 3%.
- Factory tag generation with QR codes for bar bender yard sorting.
- Direct ERP export (Excel / CSV / SAP compatible) for material procurement reconciliation.
