Engineering Transparency

Infrava Technical Roadmap

We maintain total transparency regarding what is built, what is in active development, and what is planned. No inflated claims.

Q3-Q4 2026 · Completed
Production Verified

Phase 1: Deterministic Math Core & BIS Standards Engine

  • Pure deterministic calculation engine in TypeScript for IS 2502:1963 and IS 1786:2008.
  • Accurate bend deductions (1d for 45°, 2d for 90°, 3d for 135°, 4d for 180°).
  • Seismic stirrup hook allowance (9d or 75mm minimum per IS 13920:2016).
  • Audit-stamped ExcelJS workbook generator with live formulas and verification hashes.
  • 100% automated Vitest unit test coverage for civil formulas.
Q4 2026 (Active) · Active Development
In Active Engineering

Phase 2: DXF Vector Entity Extraction & RFI Detection

  • Browser-native and server-side ASCII DXF parser for LINES, LWPOLYLINES, TEXT, and CIRCLES.
  • Automated bounding box calculation and layer clustering for columns and beams.
  • Strict "No Guessing" rule: unclassified shapes are flagged as explicit RFI questions.
  • Maker-Checker-Approver three-tier approval workflow scaffold.
  • Private beta onboarding for selected structural design and QS firms.
Q1 2027 · Scheduled

Phase 3: DWG Vector Parser & Automated Schedule OCR

  • Direct DWG format vector parsing via high-performance Cloud Run workers.
  • Automated column schedule table cross-referencing (linking C1 tags on plan to schedule rebar lists).
  • Concrete mix proportioning and dry-volume calculation per IS 456 Clause 9.
  • Multi-tenant workspace permissions for contractor and consultant collaboration.
Q2 2027 · Scheduled

Phase 4: Bar Cutting Optimization (1D Stock Cutting Algorithm)

  • 1D linear cutting stock optimization algorithm to minimize standard 12-meter commercial bar offcuts below 3%.
  • Factory tag generation with QR codes for bar bender yard sorting.
  • Direct ERP export (Excel / CSV / SAP compatible) for material procurement reconciliation.
Call NowWhatsAppGet Quote