Back to Infrava OverviewInfrava Beta Scaffold · Build v1.0.0
Interactive CAD & DXF Parsing Workspace
Upload any standard 2D AutoCAD ASCII DXF drawing file, or test with our pre-loaded framing plan. Infrava extracts columns, beams, rebar callouts, and flags unresolved geometries as explicit RFI questions.
Infrava Beta Early-Access Scaffold
Active Drawing: sample_framing_plan.dxf
Deterministic CAD entity extraction with IS 2502 code enforcement & RFI question detection.
Total Extracted Entities9
Columns Identified2
Beams Identified1
RFI Flags (No Guessing)1
Extracted Drawing Entities
dxf-1LINELayer: GRID_AXIS
grid-line
dxf-2LINELayer: GRID_AXIS
grid-line
dxf-3LWPOLYLINELayer: COLUMNS
column
dxf-4TEXTLayer: REBAR_TEXT
C1: 8-T20 + 4-T16 (M25)
rebar-callout
dxf-5LWPOLYLINELayer: COLUMNS
column
dxf-6TEXTLayer: REBAR_TEXT
C2: 8-T25 (M30)
rebar-callout
dxf-7LINELayer: BEAMS
beam
dxf-8TEXTLayer: REBAR_TEXT
B1 (230x500): 3-T16 Bot, 2-T12 Top, 2L-T8@150 c/c
rebar-callout
dxf-9LWPOLYLINELayer: UNCLASSIFIED_OPENING
RFI: Unclassified geometry on layer "UNCLASSIFIED_OPENING". Confirm if this is an RCC duct or structural shaft.
unidentified
Click any row to zoom to drawing coordinates and view bounding box dimensions.
Entity Coordinate Inspector
Select any entity from the list to view bounding box dimensions and structural schedule data.
Quality Assurance Protocol
Tier 2 VerifiedMaker-Checker-Approver Workflow Scaffold
Strict multi-tier verification ensuring no unvetted steel schedule or BOQ reaches site procurement.
Step 1: Maker
BBS Drafting & Quantity Take-off
Junior Quantity Surveyor (Thane Office)
Stamped: 2026-10-28 11:30 AM IST
“IS 2502 cutting lengths extracted from framing plan. 5% lap wastage applied.”
Step 2: Checker
Senior Structural Engineer Audit
Disha Patil (Co-Founder & Civil Eng)
Stamped: 2026-10-28 03:45 PM IST
“Verified 135° stirrup hooks on C1/C2 column ties. Slump and cover depths confirmed.”
Step 3: Approver
Final Procurement & Site Release Stamp
Raghuraj Rai (Founder & Chief Engineer)
“Awaiting contractor site milestone sign-off for rebar batch delivery.”
